1
/
of
8
Vesgantti
Vesgantti 143.7" Oversized Boneless Modular Couch, Modern 6 Seater Sectional Sofa with Ottoman & Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Beige
Vesgantti 143.7" Oversized Boneless Modular Couch, Modern 6 Seater Sectional Sofa with Ottoman & Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Beige
Regular price
$1,835.98 USD
Regular price
Sale price
$1,835.98 USD
Shipping calculated at checkout.
About This
- Flexible Modular Design: The Oversized sectional sofa has 6 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped or U shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
- Spacious & Comfortable: The 143.7 inch modular couch features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional sofa can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
- Durable and Long-lasting Support: This modern couch is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
- Premium Chenille Fabric: The modular sectional Couch is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
- No Assembly Required: No tools or complicated setup are required. Our modular sofa is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless couch is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us
Overview
- Brand : Vesgantti
- Assembly Required : No
- Weight Limit : 3850 Pounds
- Product Dimensions : 112.2"D x 143.7"W x 31.5"H
- Item Weight : 102 Pounds
- Type : Sectional
- Color : Beige
- Special Feature : Vacuums
- Room Type : Living Room
- Arm Style : Square
- Seating Capacity 7.00 : Style Modern
- : Seating Capacity 7.00
- : Style Modern
- Shape Rectangular : Material High-density foam
- : Shape Rectangular
- : Material High-density foam
Quantity
Couldn't load pickup availability
Share
