Skip to product information
1 of 7

Vesgantti

Vesgantti Full Size Mattress, 10 Inch Innerspring Hybrid Double Bed Mattress in a Box with Breathable Foam and Pocket Spring, Ergonomic Design, Medium Firm Feel

Vesgantti Full Size Mattress, 10 Inch Innerspring Hybrid Double Bed Mattress in a Box with Breathable Foam and Pocket Spring, Ergonomic Design, Medium Firm Feel

Regular price $233.98 USD
Regular price Sale price $233.98 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Medium-Firm Feel: Fully expanded 75*39*10 inch(LWH) approx. Vesgantti luxury multi-layer foam and pocket spring support system provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Individual Pocket Spring: Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
  • Breathable and Healthy: Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
  • Ultra Quite: Due to the pocket spring + multi-layer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
  • 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base.(Please note: once the mattress open and restore, it cannot be roll back again)

Overview

  • Brand : Vesgantti
  • Size : Full
  • Product Dimensions : 75"L x 54"W x 10"Th
  • Top Style : Tight Top
  • Cover Material : Polyester
  • Number of Layers : 2
  • Fill Material : Memory Foam
  • Special Feature : Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling
  • Color : White
  • Coil Type : Pocketed Coil
  • Item Weight 56.5 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 56.5 Pounds
  • : Item Firmness Description Medium Firm
Quantity
View full details